The wind turbine assembly
Valorem
The demand
Valorem wanted us to follow the installation of a wind farm in Ablaincourt in the Somme. The aim was to give an account of the challenges of mounting wind turbines, as well as the environmental issues.
Zebra’s response
The drone’ shoot was particularly complicated because of persistent bad weather. As a result, we integrated the fog as an element of style. The spectator gradually discovers the wind turbine emerging from the fog. Several protagonists, notably the mayor, evoke the environmental aspects.
Format
3 min
Diffusion
– Website
– Social networks