Loading
Zebra production
  • zebras
      • The agency
      • The Team
      • Expertise
  • projects
  • FR
  • EN
  • Menu Menu
  • zebras
    • The agency
    • The Team
  • Contact
  • FR
  • EN

The wind turbine assembly

Valorem

The demand

Valorem wanted us to follow the installation of a wind farm in Ablaincourt in the Somme. The aim was to give an account of the challenges of mounting wind turbines, as well as the environmental issues.

The Zebra’s response

The drone’ shoot was particularly complicated because of persistent bad weather. As a result, we integrated the fog as an element of style. The spectator gradually discovers the wind turbine emerging from the fog. Several protagonists, notably the mayor, evoke the environmental aspects.

Format

3 min

Diffusion

– Website

– Social networks

Mentions légales
  • Instagram
  • Linkedin
  • Facebook
  • Vimeo
Vin de by Bordeaux METRO Bordeaux wine of By Best Brigade of France
Scroll to top